ENERGY CONTROL INFRASTRUCTURE 001 / PRODUCT OVERVIEW

Know the Energy State.
Coordinate the Work.
Preserve the Record.

Electrical topology, isolation relationships and field evidence—connected in one coordinated view for complex construction and commissioning.

Built for the coordination behind mission-critical electrical work.

CONTROL, NOT CONTROL SYSTEMS

One operating picture.
Different responsibilities.

01 / THE SYSTEM AT A GLANCE

See the relationships.
Not just the equipment.

Follow the electrical relationships from incoming supply through switchgear, unit substations, distribution, and work-zone records. Select any asset to explore its connected context.

ECOS / ELECTRICAL SYSTEM VIEWSCENARIO
Scenario mode
Read the system at a glance. Trace the source path, open point, isolation record and temporary connection—then select an asset for its record.
Green moving traces indicate example source relationships. A red open switch interrupts the path towards TX-1A. Amber highlights a linked isolation record. Blue moving dashes illustrate a temporary-feed relationship on the TX-1B branch. Orange identifies a work zone pending review. No line or record verifies actual voltage absence. SCENARIO VIEW / SYSTEM RELATIONSHIPS FIG. 01 — SOURCE TO ZONE OPEN POINT / SCENARIO ISOLATION RECORD / TX-1A TEMPORARY PATH / EXAMPLE SOURCE / 01Utility 115 kV Source TRANSFORMATION / 02115 / 13.8 kV Step-Down MEDIUM VOLTAGE / 03MV Switchgear SWGR-A UNIT SUB / TX-1A13.8 kV / 480 VISOLATION RECORDED UNIT SUB / TX-1B13.8 kV / 480 VTEMP FEED EXAMPLE LOW-VOLTAGE DISTRIBUTIONMDB-01 / 480 VSAMPLE RECORD ONLY EXAMPLE RELATIONSHIPATS-02 ELEC ROOM 102 / WORK ZONEZone A-12 / PENDING MODE: DEMO / OPERATIONAL: FALSE

Select equipment to inspect its records. Tab + Enter supported.

Follow the system / MOBILE VIEW

  1. 01
    Utility source · 115 kVIncoming utility relationship
  2. 02
    Step-down · 115 / 13.8 kVExample transformation
  3. 03
    MV switchgear · SWGR-AExample distribution point
BRANCH A / EXAMPLE

TX-1A → MDB-01

A red open point separates the depicted source path from TX-1A. The amber isolation record and orange work zone A-12 require field review.

BRANCH B / EXAMPLE

TX-1B → ATS-02

Moving blue dashes identify the depicted temporary-feed relationship associated with TX-1B and ATS-02.

Diagram colors show record context—not verified electrical conditions. Field verification and work controls remain authoritative.

COORDINATION WITH FIELD AUTHORITY

Topology helps explain the relationship. A qualified person's approved field process determines the condition.

02 / ONE COORDINATED VIEW

The work is connected.
The records should be, too.

Five operating concepts describe how ECOS is being designed to organize context around hazardous-energy work.

01 / RELATIONSHIPS

Topology

Understand how sources, equipment and downstream work boundaries relate.

Does not determine live electrical state.
02 / BOUNDARIES

Isolation

Associate recorded physical isolation points with scope, people and procedure.

Does not perform physical isolation.
03 / CUSTODY

Lockboxes

Map digital lockbox records and sign-on relationships to work scope.

Physical locks remain authoritative.
04 / EVIDENCE

Verification

Organize evidence and review history provided by qualified personnel.

Never substitutes for field testing.
05 / CONTINUITY

Handover

Keep unresolved issues, responsibilities and transition records visible.

Requires human review and acceptance.
03 / RESPONSIBILITY CHAIN

Every transition
has a responsible party.

Coordinate the records and responsibilities across each stage of the energy-control process.

  1. 01

    Plan the scope

    Identify equipment, work boundaries and authoritative engineering documents.

  2. 02

    Physically isolate

    Qualified personnel execute site-approved energy-control procedures.

  3. 03

    Verify and document

    Perform required checks, then associate evidence with the responsible record.

  4. 04

    Transfer context

    Communicate pending items, responsibility and continuity across shifts.

04 / THE NON-NEGOTIABLE BOUNDARY

Technology supports.
People establish safety.

ECOS organizes hazardous-energy relationships and records across teams. Physical lockout/tagout, required testing, and safe-work authorization remain with qualified personnel under site-approved procedures.

SOFTWAREOrganizes context and records.
FIELD AUTHORITYRemains with qualified people and approved physical procedures.

The interactive scenario is a product demonstration, not a source of actual field conditions.

05 / ACCESS & EVALUATION

Designed for the work
behind the work.

Bring electrical, commissioning, and safety stakeholders into the same conversation. Request an ECOS evaluation profile for your team and project context.