ECOS PLATFORM / 01 / RELATIONSHIPS

Topology.

Understand the relationship before interpreting the record.

01 / SYSTEM ROLE

What topology makes visible.

Multiple teams may work from different drawing revisions. A shared equipment relationship view can make the described scope and unresolved mapping questions easier to see.

DESIGNED ECOS RECORDS

Digital context

  • Facility, system and equipment identifiers with source references
  • Documented parent/downstream relationships and drawing revisions
  • Work-boundary associations and unresolved mapping questions
  • Names or roles responsible for reviewing the record
FIELD PERSONNEL & EMPLOYER AUTHORITY

Physical reality & decisions

  • Confirm actual physical configuration against approved site drawings and the installation
  • Identify and assess applicable energy sources and work boundaries
  • Establish actual electrical state with approved field procedures and qualified personnel
  • Resolve any mismatch before relying on a work plan
02 / RELATIONSHIP EXPLORER

Explore the network, not a checklist.

A proposed data-center commissioning work package connects a transformer, switchgear lineup and downstream UPS equipment. Switch between map, relationship and exception views. Select equipment independently to inspect its administrative record.

INTERACTIVE RELATIONSHIPS / SOURCES · EQUIPMENT · WORK BOUNDARIES

Topology relationship explorer

Explore the modeled relationship network. Select any equipment square, then change views. Animated traces illustrate linked data—not electrical power.

SYNTHETIC EXAMPLE · NO FIELD CONNECTION
SIMULATED RECORD RELATIONSHIPS05 SELECTABLE RECORDS
Select a square to inspect
MODEL / EQUIPMENT & WORK SCOPE RELATIONSHIPS Inspect TX-02 · Source record 01 / RECORD TX-02 · SOURCE Inspect SWGR-A · Distribution record 02 / RECORD SWGR-A · MAIN LINEUP Inspect UPS-01 · Downstream record 03 / RECORD UPS-01 · DOWNSTREAM Inspect PDU-03 · Distribution record 04 / RECORD PDU-03 · DISTRIBUTION Inspect Zone A-12 · Work scope record 05 / WORK ZONE ZONE A-12 · WORK SCOPE
01 / SCOPE

Select the proposed work scope

The example associates TX-02, SWGR-A and UPS-01 with one commissioning package. This is a view of the proposed administrative scope, not confirmation of a physical connection.

ECOS RECORD CONCEPT
Record set: site, equipment tags, work package and drawing revision.
FIELD AUTHORITY
Qualified teams independently establish actual equipment identification and boundaries.

SAFETY & AUTHORITY BOUNDARYNo animated stage, diagram, recorded event or software response establishes electrical state, demonstrates isolation, grants permission to work, or substitutes for employer-approved procedures and qualified-person testing.
03 / DESIGN MODEL

How the information moves.

ECOS is being designed to preserve context through human-reviewed work transitions. These workflow concepts are not operational status claims.

01 / DEFINE

Establish scope

Associate the intended equipment set and reference drawing revision with a proposed work package.

02 / CONNECT

Map relationships

Display the described upstream and downstream links, recording uncertainties as questions.

03 / REVIEW

Resolve discrepancies

Route unverified relationships to designated personnel for field review and record corrections.