ECOS PLATFORM / 04 / EVIDENCE

Verification.

Preserve evidence while keeping field testing authoritative.

01 / SYSTEM ROLE

What verification makes visible.

Evidence can become fragmented across different systems, revisions and teams. A linked review trail helps show what was submitted, by whom, and what remains unresolved.

DESIGNED ECOS RECORDS

Digital context

  • Document references, revisions and defined review requirements
  • Evidence submissions and recorded originator information
  • Reviewer comments, exceptions and status of document review
  • Timestamps and history of evidence updates
FIELD PERSONNEL & EMPLOYER AUTHORITY

Physical reality & decisions

  • Perform testing and inspection using approved methods and equipment
  • Determine test acceptance criteria and interpret actual measurements
  • Identify electrical hazards and establish the condition of equipment
  • Authorize work or return to service under approved field procedures
02 / ILLUSTRATIVE WORKFLOW

Explore connected records, not a live system.

A UPS maintenance work package includes inspection and test evidence supplied by qualified personnel. Select the stages below to see the type of context ECOS is being designed to organize.

INTERACTIVE CONCEPT / CRITERIA · EVIDENCE · REVIEW

Verification record explorer

Select any record square or review stage to inspect its context. Animated traces illustrate connected documentation—not physical processes.

SYNTHETIC EXAMPLE · NO FIELD CONNECTION
SIMULATED RECORD LINKS03 SELECTABLE RECORDS
Select a square to inspect
Inspect Requirements 01 Requirements Inspect Submitted evidence 02 Submitted evidence Inspect Review history 03 Review history
01 / CRITERIA

Capture required review context

The example notes that a UPS work package has a referenced test/inspection requirement; it does not select or perform the test.

ECOS RECORD CONCEPT
Record set: work package, review criteria reference, version and accountable reviewer.
FIELD AUTHORITY
Qualified personnel select and apply the required technical testing procedures.

SAFETY & AUTHORITY BOUNDARYNo animated stage, diagram, recorded event or software response establishes electrical state, demonstrates isolation, grants permission to work, or substitutes for employer-approved procedures and qualified-person testing.
03 / DESIGN MODEL

How the information moves.

ECOS is being designed to preserve context through human-reviewed work transitions. These workflow concepts are not operational status claims.

01 / EXPECT

Define evidence needs

Associate the work package with relevant employer-approved review requirements.

02 / PRESERVE

Attach evidence references

Record provided test/inspection artifacts without inferring their technical validity.

03 / ASSESS

Track independent reviews

Preserve review actions, comments and unresolved technical questions.